WMATA Cheverly Bridge Realignment & Bearing Replacement

Structural Strengthening / FRP Strengthening

The Cheverly Aerial structure western abutment suffered a displacement of nearly 16” due to an adjacent general slope failure. This condition put a serious kink in the rail alignment and seriously damaged the bearings of the end span. Structural Specialists Inc. was hired by the GC on the basis of a Design/Build solution for the jacking and lateral displacement of the span in order to return it to the initial alignment. The old bearings were disposed and replaced by new spherical bearings, bridge girders were trimmed with plasma to re-create the expansion gap, new stiffeners added as well as the repair of the deck edge chipped to unlock the span and the installation of new expansion joints.

Contractor: Clark Design/Build LLC
Architect/Engineer: EMC2 / Kline Engineering
Owner: Washington Area Metropolitan Transportation Authority
Location: Capitol Heights,MDC
Completed: June 2011

Contact us today

Contact Info:

Adress: 9832 Business Way, Manassas VA 20110

Phone – (703) 659-1069

Fax – (703) 659-0943

Email – info@structural-sp.com

Structural Specialists, Inc.

9832 Business Way,

Manassas VA 20110

Contact Info

Phone (703) 659-1069

Fax (703) 659-0943

Email info@structural-sp.com

Scroll to Top